How we document, build and verify a Horizon migration
A fixed price and a fixed date are only credible if the input is complete. So we don’t ask your team what the store does. We read it.
This is the long version of what happens between signing and launch — how the current storefront gets documented, how that documentation becomes a specification somebody can be held to, how the build is kept safe from the next theme update, and what acceptance actually means when the promise is “nothing stops working.”
What is the methodology, in one paragraph?
We extract what your theme does rather than asking anyone to recall it, turn that extract into a specification your team corrects and signs off, build against the signed specification, and accept the result by comparing it to a recording of the old storefront made before anything changed.
Four steps, and the order matters more than any one of them. Most of the risk in a theme migration is concentrated in the first step, which is also the step most often compressed into a kickoff call.
The reasonable objection to any fixed-price migration is that nobody can capture four years of accumulated customization in a week — so the input is incomplete and the output is wrong. That’s true if discovery is done by asking people what they remember. The rest of this page is why we don’t.
How do you find out what the store currently does?
By reading the theme. Every section, block, setting, snippet, metafield reference, script tag, app embed and translation key is enumerable, and our tooling reads all of it.
Your theme is a file system, not a memory. You don’t get asked what you built. You get handed a list of what you built, and your job is to correct it rather than write it. That inversion is the whole point: correcting a list is something a busy team can do in an afternoon, and reconstructing four years of decisions from memory is something no team can do at all.
The extract produces four artifacts, and a migration quoted without them is quoted against assumptions.
Every template, section, custom snippet and integration in the theme, plus how far it has drifted from the base version it started as. For a lot of teams this is the first written record of what’s actually in their store.
Theme app extension, app embed, hardcoded snippet or script tag — scored against Horizon as works as-is, needs configuration, needs a vendor update, needs a custom rebuild, or has no path today. The integration method predicts migration risk more reliably than the app’s name does, and each red item gets a named owner and a cost.
Mapped to the templates that use it. Metafields survive a migration because they live in your store rather than your theme; every reference to them has to be rebuilt, which is why the references get listed and not just the fields.
Real templates, real states, real breakpoints, captured before anything is touched. This is the artifact acceptance is measured against later, and it is the reason the promise in step four can be made at all.
How we document what a theme does → · The audit that produces it →
What turns an inventory into a specification?
A working session where your team corrects what we got wrong and adds the business rules that only live in people’s heads, followed by acceptance criteria written against everything that has to keep working.
The session runs on days one and two, and it is the only phase that needs real time from your team. The extract can find that a bundle rule exists; it cannot tell you why the rule works that way, or what changes during a sale. That part genuinely needs your people — but they’re reacting to a list rather than starting from a blank page, which is a different and much shorter conversation.
Then everything gets acceptance criteria. “The cart drawer works” is not a requirement. It’s a topic. Two reasonable people can disagree about whether it’s been met, and they will, in launch week, when disagreement is most expensive. A requirement reads more like: adding an item from a collection card opens the drawer within 400ms, displays the correct variant image and line price, and increments the cart count. That can be tested. Nobody has to negotiate it.
Any promise about not losing functionality is unenforceable without criteria like that. It’s the single highest-value discipline in the whole exercise, and it’s the thing most often skipped because it’s slow to write.
Nothing is built until the specification is approved. The approval is what the fixed price is quoted against, which is also what makes a change order an actual change rather than a correction of something we should have caught.
How is the build kept from breaking on the next theme update?
Custom work goes into separate block and section files. Core theme files are not edited, because a theme that edits core files breaks the next time Shopify ships an update to them.
This is the single most common complaint about Horizon, and it’s mostly avoidable. It is also the thing that determines what your storefront costs to own three years from now, which is why it’s worth asking any agency about before signing anything — ours included.
- Custom work lives in its own block and section files, never in core theme files
- The build is reviewed by a solutions engineer before it goes anywhere near your team
- The theme is handed to your GitHub, so the code is yours and the history is visible
- Every app scored red in the integration map has its named owner and its fix carried through to launch, not discovered in week three
The build runs across weeks one and two and needs nothing from your team while it’s happening.
What actually breaks and why → · Twelve questions to ask a migration agency →
How do you verify that nothing stopped working?
By comparing the new storefront against the recording of the old one made in step one, rather than against a checklist somebody typed.
A written specification catches what was written down. A behavioral comparison catches what wasn’t. If it worked on your old store and it doesn’t work on the new one, the comparison catches it — whether or not anybody thought to document it.
The document isn’t the safety net. The diff is.
Week three is where your team sees it. You get a sandbox environment to test in against the criteria signed off on day two, plus before-and-after reports on speed, technical SEO and accessibility — run by us, not pulled from a dashboard, so the two sides of the comparison were measured the same way.
Everything to verify before you publish → · Protecting SEO through the switch →
What does the schedule look like?
Four weeks from requirements sign-off to launch, with one to two days of your team’s time at the start and roughly two hours after it.
| Phase | What happens | What we need from you |
|---|---|---|
| Days 1–2 | Requirements sign-off — you correct the extract, add the business rules, approve the specification | One to two days, and it’s the only phase that needs real time from your team |
| Weeks 1–2 | Build against the approved specification, reviewed by a solutions engineer, handed to your GitHub | Nothing |
| Week 3 | Sandbox environment, plus before-and-after reports on speed, SEO and accessibility | Whatever testing time your team wants to spend |
| Week 4 | Launch, then a training session on what the new storefront lets your team do without developers | 90 minutes |
| Two weeks later | Follow-up, once your team has used it and has real questions | 30 minutes |
| 30 days after launch | Warranty — anything that worked before and doesn’t now, we fix free | Nothing |
The audit runs before all of this and does the documentation work that would otherwise consume the first two weeks, which is why week one is a review rather than an investigation.
What happens if something is missed anyway?
It gets fixed free for thirty days after launch, and your old theme is still sitting in your library if the answer needs to be faster than that.
No methodology catches everything, and an agency claiming otherwise is describing a sales position rather than a process. So there are two backstops, and both are written into the engagement.
Anything that worked before and doesn’t now, we fix free. Not a support retainer and not a goodwill gesture — it’s the natural consequence of having a recording of what “worked before” means, which is what makes the claim adjudicable in the first place.
It stays in your theme library, unpublished and unmodified, permanently. Rollback is one click. That is worth saying plainly because it’s the thing most people are actually worried about when they ask what happens if the migration goes badly.
Frequently asked questions
How can you quote a fixed price before seeing the store?
We don’t. Every migration starts with a 5-Day Horizon Readiness Audit, which is what produces the inventory, the app compatibility register and the behavioral recording. The fixed price is quoted against those, not against a conversation. The audit is $2,500 and comes off the migration price.
How much of my team’s time does this actually take?
One to two days for the requirements session at the start, whatever testing time you want to spend in week three, 90 minutes of training at launch and a 30-minute follow-up two weeks later. The build phase needs nothing from you.
What if we disagree about whether something works?
That’s what the acceptance criteria are for. A criterion states what should happen, in what order, with what displayed — so it can be tested rather than argued about. Where a criterion wasn’t written, the behavioral recording of the old store settles it instead.
Do we own the code afterward?
Yes. The theme is handed to your GitHub, with custom work in its own block and section files rather than edited into core theme files, so the next Shopify update doesn’t overwrite it and the next agency can read it.
Can we take the documentation and build it ourselves?
Yes, and several brands have. The audit deliverable is yours whatever you decide next, including hiring somebody else or doing the work in-house. It’s a legitimate outcome and we’d rather say so than pretend the document only works in our hands.
The methodology starts with the audit.
Five days, $2,500, credited in full against a Horizon Sprint booked within 30 days. You get the current-state inventory, the app-by-app compatibility register, before-and-after-able performance, SEO and accessibility scores, and a straight recommendation — including not migrating, if that’s the honest answer.
If you’d rather see the scope, guarantees and price of the migration itself first, that’s all on the migration page.










